Client project

Deep Space Antenna – New Norcia

Client
McCorkell
Location
New Norcia, WA
Project Status
Complete

Overview

Doolee was contracted to ESA-Site infrastructures for a second deep space antenna, which is located approximately 8 km south-southeast of New Norcia.

Scope of work

  • Stripping site and clearing top soil
  • Removing existing track
  • Bulk earthworks (cut and fill)
  • Including but not limited to roads, pavements, antenna hardstand, antenna crane platform, power plant building pad, fire tank area, diesel tank area, landscaping area, swales, mounds and batters
  • Importation of fill as required
  • Subgrade, subbase and base for roads and hardstands
  • Kerbing works
  • Seal to roads
  • Civil drainage works including but not limited to v-drains, swales, culverts, headwalls, pipework, pits, and rock pitching
  • HV works including but not limited to clearing, excavation, conduits, pits, and RMU compound site works.

A lot of progress has been made so far in terms of bulk earthworks whereby over 7500 m³ of soil has been excavated, filled and compacted, and an additional 7000 m³ of fill material has also been imported in a span of Six weeks. Drainage works have also commenced with 50% of the V-drains having been excavated.

The program of works is currently on schedule and we look forward to delivering a successful project within the required timeframes.

Successful projects start with the right partner

Get in touch with us to discuss how Doolee’s turnkey services can support your operations.

Get in touch

T 1300 620 843E info@doolee.com.au

Doolee excavator and ute on a mine site in front of a rock face