Fortescue Decarbonisation Project – Substation Construction

Client
Fortescue
Location
Cloudbreak, Christmas Creek and Lambda Substations, WA
Project Status
Ongoing

Overview

The project involves the construction of 2 new substations at Cloudbreak and Christmas Creek as well as extension works to the existing Lambda substation. Doolee are currently completing all detailed earthworks, underground service install and concrete works to deliver the project in conjunction with RSGx. The scope also includes the installation of 2 firewalls around the new transformer bunds. The project is currently on site and to be complete in Q3 2025.

Scope of work

  • 2 no GIS building slabs
  • 4 no transformer bunds
  • 2 no transformer firewalls
  • 2 no control room slabs
  • Underground trafficable culverts
  • Various concrete footings for generators, surge arresters and ancillary equipment
  • Trenching, laying conduit and backfilling for electrical conduits and earthing
  • Rock protection

Challenges

  • Working within a live mine site and substation
  • Existing site with high voltage power lines
  • Simultaneous activities with other contractors including structural, electrical and equipment vendors

Highlights

  • Works progressing well to complete the first substation in July 2025
  • Successful delivery of large concrete pours
  • Positive client reviews

Successful projects start with the right partner

Get in touch with us to discuss how Doolee’s turnkey services can support your operations.

Get in touch

T 1300 620 843E info@doolee.com.au

Doolee excavator and ute on a mine site in front of a rock face