Overview

Doolee were engaged by Rhomberg Rail to perform protective coating repairs area to Kyogle Rail-bridges in the Hunter Valley. The scope of works included to identify and rectify critical structural elements such as gusset plates and connections showing signs of corrosion across a double-span bridge structures.

Scope of work

  • Steelwork was assessed to identify and prioritise areas for coating repair. Agreed areas were then marked up for surface preparation.
  • Repair areas were prepared via mechanical means which included, needle-guns, die-grinders and bristle-blasters with vacuum attachments to contain dust.
  • A two-coat coating system was specified for the works which comprised of an aluminium impregnated surface tolerant high-build epoxy, followed by a surface tolerant MIO topcoat

Highlights

  • Works were carried out during track possession periods between daily train movements
  • Existing coating comprised of lead which was managed in accordance with relevant standards
  • Access to bridge structure was via suspended scaffold
  • Care was taken to ensure paint flakes were captured and did not enter the below waterway
  • As a result of the works the overall lifespan of the bridge structure has been protected and increased

Successful projects start with the right partner

Get in touch with us to discuss how Doolee’s turnkey services can support your operations.

Get in touch

T 1300 620 843E info@doolee.com.au

Doolee excavator and ute on a mine site in front of a rock face